Acciona withdraws its application to build the 'Bodeguillas' 42 MW photovoltaic solar plant in Ayora (Valencia)
08 Jun 2026Effective: 08 Jun 2026102 views
Who is affected:
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete
Summary
Corporación Acciona Eólica withdraws from its 42 MW hybrid photovoltaic plant project in Ayora, Valencia. The Ministry officially accepts the abandonment of the administrative file.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines accepts the withdrawal submitted by Corporación Acciona Eólica, SL on March 16, 2026 regarding the 'Bodeguillas' hybrid photovoltaic project of 41.99 MWp in Ayora (Valencia). The project had been requested in December 2022 and accumulated with seven other Acciona grou…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 27 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Corporación Acciona Eólica, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción, declaración de impacto ambiental y declaración en concreto de utilidad pública de la infraestructura híbrida fotovoltaica «Bodeguillas», de 41,99 MWp, y su infraestructura de evacuación, en Ayora (Valencia).
Corporación Acciona Eólica withdraws from its 43 MW hybrid photovoltaic plant project in Ayora, Valencia. The Ministry formally accepts the abandonment of the a...
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete
The Ministry allocates to Coventina Renovables the access capacity of 408 MW at the just transition node Meirama 220 kV for renewable generation. The company pr...
Renewable energy development companies and electrical system operators in just transition areas
Enresa is authorized to build a temporary storage facility for radioactive waste from the Vandellós I nuclear power plant, now decommissioned. The facility will...
Enresa, Nuclear Safety Council, local administrations and citizens in the Vandellós area
The Ministry authorizes Red Eléctrica to install a 400/220 kV transformer of 600 MVA in Soria to connect two substations. The work is included in the Electricit...
Red Eléctrica de España, SAU, and administrations of Castilla y León involved in the area
Corporación Acciona Eólica withdraws from its 51 MW hybrid photovoltaic plant project in Ayora (Valencia). The Directorate General for Energy Policy formally ac...
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete involved
Acciona abandons its 45.25 MW hybrid solar plant project in Ayora (Valencia). The Directorate General for Energy Policy formally accepts the withdrawal of the a...
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete involved