Allocation of 408 MW of renewable evacuation capacity at the Meirama electrical node to Coventina Renovables
09 Jun 2026Effective: 09 Jun 2026101 views
Who is affected:
Renewable energy development companies and electrical system operators in just transition areas
Summary
The Ministry allocates to Coventina Renovables the access capacity of 408 MW at the just transition node Meirama 220 kV for renewable generation. The company provided a guarantee of 52.8 million euros.
Detailed analysis
PRO
Order TED/578/2026 resolves the public tender called in December 2024 to assign 408 MW of evacuation capacity at the Meirama 220 kV node, located in a just transition area in Galicia. Of seven admitted applications, Coventina Renovables obtained the highest score (73.53 points) with its CHR Meirama project, surpassing …
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Orden TED/578/2026, de 29 de mayo, por la que se resuelve el concurso público para la concesión de capacidad de acceso de evacuación a la red de energía eléctrica de instalaciones de generación de electricidad de procedencia renovable en el nudo de transición justa Meirama 220 kV.
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing