Acciona withdraws its application to build the 'Rincón del Cabello' 45 MW photovoltaic solar plant in Ayora (Valencia)
06 Jun 2026Effective: 06 Jun 202698 views
Who is affected:
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete involved
Summary
Acciona abandons its 45.25 MW hybrid solar plant project in Ayora (Valencia). The Directorate General for Energy Policy formally accepts the withdrawal of the application.
Detailed analysis
PRO
Corporación Acciona Eólica, SL submitted in March 2026 the formal withdrawal of its authorization request for the Rincón del Cabello hybrid photovoltaic plant of 45.25 MWp in Ayora (Valencia), initiated in December 2022. The project was part of a group of facilities processed jointly that was separated following the co…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 27 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Corporación Acciona Eólica, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción, declaración de impacto ambiental y declaración en concreto de utilidad pública de la infraestructura híbrida fotovoltaica «Rincón del Cabello», de 45,25 MWp, y su infraestructura de evacuación, en Ayora (Valencia).
Corporación Acciona Eólica withdraws from its 51 MW hybrid photovoltaic plant project in Ayora (Valencia). The Directorate General for Energy Policy formally ac...
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete involved
The Ministry authorizes Red Eléctrica to install a 400/220 kV transformer of 600 MVA in Soria to connect two substations. The work is included in the Electricit...
Red Eléctrica de España, SAU, and administrations of Castilla y León involved in the area
Corporación Acciona Eólica withdraws from its 42 MW hybrid photovoltaic plant project in Ayora, Valencia. The Ministry officially accepts the abandonment of the...
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete
Technical sheets are updated to calculate energy savings in rehabilitation of residential building envelopes and a specific sheet is added for attics and lofts.
Developers, builders, property owners and CAE system agents in residential rehabilitation
The Government approves the bases for granting subsidies to innovative energy saving projects. The grants will be awarded by competitive procedure managed by th...
Companies, entities and self-employed individuals with innovative energy efficiency projects in Spain
The CNMC maintains for the 2027 gas year the same transport network, local network and regasification tolls that were in force in 2026, pending new regulatory r...
Transport companies, gas distributors, traders and large industrial consumers