Biomethane in Segovia: Redexis injects renewable gas into transport network with investment of 50,854 €
Redexis Infraestructuras obtains authorization to inject up to 2,775 Nm³/h of biomethane into the Segovia Norte pipeline...
Sep 26, 2026
6 min