Corporación Acciona Eólica withdraws from its 42 MW hybrid photovoltaic plant project in Ayora, Valencia. The Ministry officially accepts the abandonment of the administrative file.
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete
06 Jun 2026
3/10
Public Sector
Effective: 06/06/2026
The Ministry of Industry and Tourism is calling for several Deputy Subdirector and Area Coordinator positions by free appointment. Career civil servants have 15 working days to submit their applications electronically.
Career civil servants of group A1 of the General State Administration
06 Jun 2026
3/10
Public Sector
Effective: 06/06/2026
INGESA corrects two errors in the Technical Engineer opposition call: clarifies that the required degree is in Industrial Engineering and corrects the teaching hour score from 0.25 to 0.025 points.
Applicants for Technical Engineer positions in INGESA health institutions
The Civil Aviation Safety Agency and SENASA formalize their collaboration in technical assistance projects with national and international civil aviation bodies. Activities will be financed by external organizations, at ...
Aeronautical sector, international civil aviation bodies, AESA and SENASA
The 2026 salaries for Evolutio Cloud Enabler workers are approved, with base salaries ranging from 17.094€ to 32.685€ annually according to professional group. The shift, on-call and holiday policy is also updated.
Workers and company Evolutio Cloud Enabler, SAU
06 Jun 2026
3/10
Public Sector
Effective: 06/12/2026
The Spanish Centre for Metrology sets new public prices for its calibration and technical testing services, replacing those from 2019. They come into force 6 months after their publication in the BOE.
Companies and institutions that contract calibration and metrological testing services from the CEM
Acciona abandons its 45.25 MW hybrid solar plant project in Ayora (Valencia). The Directorate General for Energy Policy formally accepts the withdrawal of the application.
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete involved
Corporación Acciona Eólica withdraws from its 51 MW hybrid photovoltaic plant project in Ayora (Valencia). The Directorate General for Energy Policy formally accepts the abandonment of the file.
Corporación Acciona Eólica, SL and administrations of Valencia and Albacete involved
The Ministry authorizes Red Eléctrica to install a 400/220 kV transformer of 600 MVA in Soria to connect two substations. The work is included in the Electricity Transmission Network Development Plan 2021-2026.
Red Eléctrica de España, SAU, and administrations of Castilla y León involved in the area
05 Jun 2026
3/10
Public Sector
The UPV convenes 1 position of Qualified Laboratory and Workshops Technician (communications-electronics area) through free competitive examination. Applications are submitted electronically within 10 working days from i...
Persons with university qualifications seeking public employment at the UPV (electronics area)