Energy BOE Importance: 3/10

Authorization of 26.74 MW storage battery system to hybrid with Montesol solar plant in Teruel

22 Oct 2026 Effective: 22 Oct 2026 0 views
Who is affected:
Promoting company Planta Solar OPDE 6 SL, Aragonese administrations and renewable energy sector

Summary

Authorization is granted to build a 26.74 MW battery storage system next to the Montesol solar park in Cañada Vellida (Teruel) to store photovoltaic energy. The installation will connect to the existing electrical grid via an underground line at 30 kV.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Planta Solar OPDE 6, SL prior and construction authorization for a 26.74 MW battery storage module in Cañada Vellida (Teruel), hybridized with the Montesol photovoltaic park of 41.6 MW already operational. The project was processed through simplified procedure …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 5 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta Solar OPDE 6, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Hibridación Montesol», de 26,74 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Montesol», de 41,6 MW de potencia instalada, en Cañada Vellida (Teruel).

Related regulations

Almost there