Land Registry must register leases of part of a property for photovoltaic plants without requiring georeferencing
24 Mar 2026Effective: 18 Dec 202578 views
Who is affected:
Photovoltaic plant developers, rural property owners and land registrars
Summary
The DGRN requires registration of leases over part of a property for photovoltaic installations even when the exact georeferencing of the leased portion is not provided.
Detailed analysis
PRO
The Dirección General de Seguridad Jurídica y Fe Pública rules that the registrar of Mula cannot deny registration of a lease right over part of a property intended for a photovoltaic plant due to lack of georeferencing. The resolution clarifies that georeferencing is mandatory for first registrations and excess area d…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 18 de diciembre de 2025, de la Dirección General de Seguridad Jurídica y Fe Pública, en el recurso interpuesto contra la negativa del registrador de la propiedad de Mula a inscribir la constitución de un derecho de arrendamiento sobre parte de finca, por no aportarse la georreferenciación de la parte de la finca sobre la que se constituye el derecho de arrendamiento, con destino a la construcción de una planta fotovoltaica.
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing