Authorization for new 400 kV electrical substation in Carreño (Asturias)
30 Mar 2026Effective: 10 Mar 2026157 views
Who is affected:
Landowners of affected plots and energy companies in Asturias
Summary
Red Eléctrica de España is authorized to build a new electrical substation in Carreño, Asturias. The installation is declared of public utility.
Detailed analysis
PRO
The Dirección General de Política Energética y Minas grants Red Eléctrica de España, SAU, prior administrative and construction authorization for the Cardoso 400 kV substation in Carreño (Asturias), including three new bays and interconnection of autotransformer ATP1. The public utility declaration facilitates compulso…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 10 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Red Eléctrica de España, SAU, autorización administrativa previa y autorización administrativa de construcción para la nueva subestación Cardoso 400 kV, con tres nuevas posiciones, y la interconexión del autotransformador ATP1, en Carreño (Asturias), y se declara, en concreto, la utilidad pública.
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing