Carina Solar 9 solar plant in Toledo denied to Solaria due to expiration of grid connection permits
13 Aug 2026Effective: 13 Aug 202647 views
Who is affected:
Solaria Promoción y Desarrollo Fotovoltaico SLU and solar plant developers in processing
Summary
The General Directorate of Energy Policy denies Solaria authorization to build a 49.4 MW solar plant in Toledo after its electrical grid access permits expire.
Detailed analysis
PRO
The General Directorate of Energy Policy and Mines rejects Solaria's application for the Carina Solar 9 photovoltaic plant (49.4 MW) in Toledo, despite having a favorable environmental impact statement (February 2023) and prior administrative authorization (May 2023). The determining reason is the expiration, communica…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 20 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Solaria Promoción y Desarrollo Fotovoltaico, SLU, de autorización administrativa previa y autorización administrativa de construcción para la instalación fotovoltaica Carina Solar 9, de 49,4 MW de potencia instalada, y su infraestructura de evacuación, en la provincia de Toledo.
Planta Solar OPDE 25 is authorized to build a 43.9 MW battery storage system alongside its Covatillas 3 photovoltaic park in Castillejo de Iniesta (Cuenca). The...
Promoting company Planta Solar OPDE 25 SL and renewable energy sector in Cuenca
Arena Power Solar 33 renounces construction of a 54 MW solar plant in Beas and Trigueros (Huelva) due to incompatibility with the future Seville-Huelva high-spe...
Promoter company Arena Power Solar 33 SLU and municipalities of Beas and Trigueros (Huelva)
Arena Power Solar 35 renounces construction of a 57.5 MW solar plant in Huelva as it interferes with the future Seville-Huelva high-speed rail route. The Direct...
Renewable energy developers and photovoltaic sector companies in Huelva
Savanna Power Solar 9 withdraws from building a 59 MW solar plant in Huelva due to incompatibility with the future AVE Sevilla-Huelva. The Ministry accepts the ...
Renewable energy developers and photovoltaic sector in Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia