Energy BOE Importance: 2/10

Correction of Elawan Olmedo I solar plant power in Valladolid: from 50,064 MW to 49,61 MW

16 Sep 2026 Effective: 16 Sep 2026 3 views
Who is affected:
Elawan Energy Olmedo 1, SL, and administrations with competencies over the installation

Summary

An error in the authorization of the Elawan Olmedo I photovoltaic plant in Valladolid is corrected, adjusting its official power from 50,064 MW to 49,61 MW.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines rectifies through error correction the resolution of 24 May 2024 that authorized the Elawan Olmedo I photovoltaic plant in Ramiro and Medina del Campo (Valladolid). The error affects the installed power stated in the prior administrative authorization and construction…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 8 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 24 de mayo de 2024, por la que se otorga a Elawan Energy Olmedo 1, SL, autorización administrativa previa de modificaciones y autorización administrativa de construcción para la instalación fotovoltaica “Elawan Olmedo I”, de 50,064 MW de potencia instalada, y sus infraestructuras de evacuación, en Ramiro y Medina del Campo (Valladolid).

Related regulations