Energy BOE Importance: 3/10

Cancelled 54 MW Campos del Condado IV solar plant in Huelva

21 Aug 2026 Effective: 21 Aug 2026 0 views
Who is affected:
Promoter company Arena Power Solar 33 SLU and municipalities of Beas and Trigueros (Huelva)

Summary

Arena Power Solar 33 renounces construction of a 54 MW solar plant in Beas and Trigueros (Huelva) due to incompatibility with the future Seville-Huelva high-speed rail.

Detailed analysis PRO

Arena Power Solar 33, SLU, withdraws its authorization request for construction of the Campos del Condado IV photovoltaic plant (54.425 MW) in Huelva, following the final approval of the informative study for the Seville-Huelva high-speed rail line in December 2024, which affected the planned 220 kV collector substatio…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 5 de agosto de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Arena Power Solar 33, SLU, de la solicitud de autorización administrativa de construcción para la instalación fotovoltaica Campos del Condado IV, de 54,425 MW de potencia instalada, y su infraestructura de evacuación en Beas y Trigueros (Huelva).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations