Energy BOE Importance: 3/10

Arena Power Solar Withdraws from Construction of Campos del Condado VI Photovoltaic Plant in Huelva Due to Incompatibility with Seville-Huelva High-Speed Rail

21 Aug 2026 Effective: 21 Aug 2026 0 views
Who is affected:
Renewable energy developers and photovoltaic sector companies in Huelva

Summary

Arena Power Solar 35 renounces construction of a 57.5 MW solar plant in Huelva as it interferes with the future Seville-Huelva high-speed rail route. The Directorate General for Energy Policy accepts the withdrawal and archives the file.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines accepts the withdrawal by Arena Power Solar 35, SLU, of the request for administrative authorization to construct the Campos del Condado VI photovoltaic plant (57.535 MW) in Beas, Trigueros and Gibraleón (Huelva). The promoter initiated the project in 2021, obtained a…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 5 de agosto de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Arena Power Solar 35, SLU, de la solicitud de autorización administrativa de construcción para la instalación fotovoltaica Campos del Condado VI, de 57,535 MW de potencia instalada, y su infraestructura de evacuación en Beas, Trigueros y Gibraleón (Huelva).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations