Authorization for 59.2 MW photovoltaic solar plant in Huelva for Jinko Greenfield
22 Jun 2026Effective: 22 Jun 2026294 views
Who is affected:
Promoting company Jinko Greenfield Spain 1 SL, municipalities of Alosno and El Cerro de Andévalo (Huelva)
Summary
The Ministry authorizes Jinko Greenfield Spain 1 to build a 59.2 MW solar plant in Alosno and El Cerro de Andévalo (Huelva). The installation includes underground lines and a step-up substation for energy evacuation.
Detailed analysis
PRO
The General Directorate of Energy Policy and Mines grants prior administrative authorization to Jinko Greenfield Spain 1, SL for the FV La Puebla 4 photovoltaic plant of 59.2 MW in Huelva. The evacuation infrastructure includes 30 kV underground lines, SET La Puebla 3 and 4 step-up substation of 30/220 kV and 220 kV ov…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 3 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Jinko Greenfield Spain 1, SL, autorización administrativa previa para la instalación fotovoltaica FV La Puebla 4, de 59,2 MW de potencia instalada, y su infraestructura de evacuación, en Alosno y El Cerro de Andévalo (Huelva).
La empresa Savanna Power Solar 9 renuncia a construir una planta solar de 59 MW en Huelva por incompatibilidad con el futuro AVE Sevilla-Huelva. El Ministerio a...
Promotores de energías renovables y sector fotovoltaico en Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection