Authorization for Enel hybrid solar and wind plant in Teruel with over 107 MW of power
25 Jun 2026Effective: 25 Jun 202694 views
Who is affected:
Enel Green Power España, municipalities of Alcorisa, Calanda and Alcañiz, and renewable energy developers in the surrounding area
Summary
Enel Green Power España is authorized to build a hybrid photovoltaic and wind installation in Alcorisa, Calanda and Alcañiz (Teruel) with 107 MW of total power. It includes substations and evacuation lines at 400 kV.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants prior administrative authorization to Enel Green Power España for the HB7-Pitarra hybrid installation in Teruel, composed of 61.729 MW photovoltaic and 45.6 MW wind. The evacuation infrastructure includes two collector substations and aerial lines at 400 kV con…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 1 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Enel Green Power España, SL, autorización administrativa previa para la instalación híbrida «HB7-Pitarra», compuesta por el módulo solar fotovoltaico «Regallo», de 61,729 MW de potencia instalada, el módulo eólico «Pitarra», de 45,6 MW de potencia instalada, y sus infraestructuras de evacuación, en Alcorisa, Calanda y Alcañiz (Teruel).
Enel Green Power España withdraws from building a hybrid photovoltaic and wind installation of 152.84 MW in Teruel due to the conditions of the environmental im...
Enel Green Power España, SL and municipalities of Alcorisa, Andorra, Calanda and Alcañiz (Teruel)
Enel Green Power España withdraws from building a 124.54 MW hybrid photovoltaic and wind installation in Andorra and Alcorisa (Teruel) due to the conditions imp...
Enel Green Power España and municipalities of Andorra and Alcorisa (Teruel)
Enel Green Power España withdraws from its 132 MW hybrid plant project in Híjar and Samper de Calanda (Teruel) following the conditions imposed by the environme...
Enel Green Power España, SL and municipalities of Híjar and Samper de Calanda (Teruel)
Power Tarida company withdraws from building a 100 MW energy storage plant in Huesca after receiving unfavorable environmental reports. The Ministry accepts the...
Promoting company Power Tarida SL and the energy storage sector in Aragón
The environmental impact statement for the Alhambra solar park in La Solana (Ciudad Real) is approved, which will be combined with the existing 34 MW wind farm ...
Promoter Parques Eólicos Ciudad Real S.L., local administrations and landowners in La Solana and Alhambra (Ciudad Real)
The Government establishes the framework for calling auctions that grant economic aid to high-efficiency cogeneration facilities. The aim is to renew and expand...
Industrial and energy companies that are owners or promoters of high-efficiency cogeneration installations