Environmental approval of Alhambra 24.7 MW photovoltaic solar park in Ciudad Real to hybridize with existing wind farm
25 Jun 2026Effective: 25 Jun 202644 views
Who is affected:
Promoter Parques Eólicos Ciudad Real S.L., local administrations and landowners in La Solana and Alhambra (Ciudad Real)
Summary
The environmental impact statement for the Alhambra solar park in La Solana (Ciudad Real) is approved, which will be combined with the existing 34 MW wind farm to optimize energy evacuation.
Detailed analysis
PRO
The General Directorate of Quality and Environmental Assessment issues the environmental impact statement for the Alhambra photovoltaic solar park (24.718 MW) in La Solana, Ciudad Real, promoted by Parques Eólicos Ciudad Real S.L. The project includes 54,600 photovoltaic modules on horizontal trackers, 17 inverters and…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 8 de junio de 2026, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula declaración de impacto ambiental del proyecto «Parque solar fotovoltaico Alhambra, de 24,718 MW de potencia instalada, para su hibridación con el parque eólico existente Alhambra, de 34 MW, y parte de su infraestructura de evacuación, en la provincia de Ciudad Real».
La empresa Savanna Power Solar 9 renuncia a construir una planta solar de 59 MW en Huelva por incompatibilidad con el futuro AVE Sevilla-Huelva. El Ministerio a...
Promotores de energías renovables y sector fotovoltaico en Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection