Energy BOE Importance: 3/10

Authorization for 55 MW BESS battery plant in Vall d'Uixó (Castellón)

23 Oct 2026 Effective: 23 Oct 2026 0 views
Who is affected:
Promoting company Soner Picasso SLU, local and regional administrations of Castellón

Summary

The Ministry authorizes Soner Picasso, SLU, to build an energy storage plant with 55 MW batteries in Castellón. It includes electrical evacuation infrastructure up to the transmission network.

Detailed analysis PRO

The General Directorate of Energy Policy and Mines grants prior administrative authorization to Soner Picasso, SLU, to install a 55.176 MW BESS plant in Vall d'Uixó (Castellón). The installation includes 30 kV lines, 30/220 kV collector substation and 220 kV line to Red Eléctrica substation. The project passed simplifi…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 7 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Soner Picasso, SLU, autorización administrativa previa para la planta de almacenamiento con baterías BESS Cuevas, de 55,176 MW de potencia instalada, y su infraestructura de evacuación, en la Vall d'Uixó (Castellón).