Authorization for new seawater intake system at Ziérbena gas plant (Bizkaia)
15 Jul 2026Effective: 15 Jul 202685 views
Who is affected:
Bahía de Bizkaia Gas, SL and the natural gas supply system in northern Spain
Summary
The Ministry authorizes Bahía de Bizkaia Gas to install its own seawater intake system to improve regasification and reduce CO₂ emissions.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Bahía de Bizkaia Gas, SL authorization to build an alternative seawater intake and discharge system at its regasification plant in Ziérbena (Bizkaia), with a budget of 9.16 million euros. Currently the plant depends on the intake system of the combined cycle po…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 29 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Bahía de Bizkaia Gas, SL, autorización administrativa y aprobación del proyecto de ejecución de las instalaciones del proyecto «Sistema alternativo de captación de agua de mar para la Planta de Regasificación de Bahía de Bizkaia Gas (BBG) en Ziérbena, Bizkaia».
Ictio Solar Auriga is authorized to install a 19.96 MW battery system alongside its existing solar plant in Ciudad Real, forming a hybrid installation of 67 MW.
Ictio Solar Auriga SL and renewable energy sector in Castilla-La Mancha
Ictio Solar Berenice is authorized to install a battery system of almost 20 MW alongside its existing photovoltaic plant in Ciudad Real, forming a combined inst...
Ictio Solar Berenice SL and energy operators in the Alcázar de San Juan area
Technical corrections to the European RED III Directive promoting renewable energy are published. It affects regulations on fuels and renewable energy targets i...
Energy companies, renewable energy developers, biofuel producers, and public administrations
The Ministry approves the environmental impact of the Muracais wind farm in Lugo, with 13 wind turbines and 52.8 MW. The project includes electrical evacuation ...
Promoter Antila Solar SL, municipalities of Castroverde, Baleira and A Fonsagrada (Lugo)