Energy BOE Importance: 3/10

Authorization of 39.6 MW storage battery system to hybridize with solar plant in Alcalá de Guadaíra (Seville)

16 Jul 2026 Effective: 16 Jul 2026 3 views
Who is affected:
Elvisa Solar, SLU and local administrations of Alcalá de Guadaíra (Seville)

Summary

Elvisa Solar is authorized to build a 39.6 MW battery storage system alongside its existing solar plant in Seville to store renewable energy.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Elvisa Solar, SLU, prior and construction authorization for a 39.6 MW battery storage module in Alcalá de Guadaíra, which will be hybridized with its existing 47.4 MW photovoltaic park. Evacuation will be carried out through underground lines at 30 kV and a sec…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 25 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Elvisa Solar, SLU, la autorización administrativa previa y la autorización administrativa de construcción del módulo de almacenamiento por baterías «Elvisa», de 39,6 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Elvisa», de 47,4 MW de potencia instalada, en Alcalá de Guadaíra (Sevilla).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations