Energy BOE Importance: 4/10

Authorization to inject biomethane into the Zaragoza-Calatayud pipeline in La Almunia de Doña Godina

18 Sep 2026 Effective: 01 Sep 2026 27 views
Who is affected:
Redexis Infraestructuras SL, biomethane producers and gas sector in Aragón

Summary

The Government authorizes Redexis to build a connection to introduce renewable biomethane into the existing gas network in Zaragoza. This facilitates the use of green gas in Spanish gas infrastructure.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Redexis Infraestructuras, SL, administrative authorization and approval of the execution project to install a new biomethane connection point in the primary transport pipeline Zaragoza-Calatayud, in La Almunia de Doña Godina (Zaragoza). The facilities will allo…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 1 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Redexis Infraestructuras, SL, autorización administrativa y aprobación del proyecto de ejecución de las instalaciones del «Proyecto de nueva posición sobre el gaseoducto Zaragoza-Calatayud para inyección de biometano en La Almunia de Doña Godina (Zaragoza)».

Related regulations