Energy BOE Importance: 3/10

Environmental report approved for installing storage batteries next to Larral solar plant in Zaragoza

18 Sep 2026 Effective: 18 Sep 2026 26 views
Who is affected:
Promoter Planta Solar OPDE 8 SL and administrations of Aragón and Zaragoza

Summary

The Ministry approves the environmental report for a 26.74 MW battery system that will store energy from the Larral photovoltaic plant in Zaragoza. The project occupies 1.20 ha and does not require ordinary environmental assessment.

Detailed analysis PRO

The Directorate General for Quality and Environmental Assessment issues a favorable simplified environmental impact report for the hybridization of the Larral photovoltaic plant (40 MW) with a 26.74 MW battery storage system in Zaragoza. The project, promoted by Planta Solar OPDE 8 SL, occupies 1.20 ha and connects via…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 7 de septiembre de 2026, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula informe de impacto ambiental del proyecto «Infraestructura de almacenamiento con baterías “Hibridación Larral”, para su hibridación con el parque fotovoltaico existente Larral, y su infraestructura de evacuación, en la provincia de Zaragoza».