Authorization of 26.74 MW battery storage system to hybridize with solar plant in Cuenca
20 Jun 2026Effective: 20 Jun 202653 views
Who is affected:
Promoting company Planta Solar OPDE 51 SL and renewable energy sector
Summary
Authorization is granted to build a 26.74 MW battery system next to the OPDE Belinchón 1 solar plant in Barajas de Melo (Cuenca). It enables solar energy storage to improve electricity supply.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Planta Solar OPDE 51, SL prior and construction authorization for a 26.74 MW battery storage module in Barajas de Melo (Cuenca), which will be hybridized with the existing 48.118 MW photovoltaic plant. The processing was conducted under the simplified procedure…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 31 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta Solar OPDE 51, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Hibridación OPDE Belinchón 1», de 26,74 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «OPDE Belinchón 1», de 48,118 MW de potencia instalada, en Barajas de Melo (Cuenca).
Planta Solar OPDE 25 is authorized to build a 43.9 MW battery storage system alongside its Covatillas 3 photovoltaic park in Castillejo de Iniesta (Cuenca). The...
Promoting company Planta Solar OPDE 25 SL and renewable energy sector in Cuenca
Arena Power Solar 33 renounces construction of a 54 MW solar plant in Beas and Trigueros (Huelva) due to incompatibility with the future Seville-Huelva high-spe...
Promoter company Arena Power Solar 33 SLU and municipalities of Beas and Trigueros (Huelva)
Arena Power Solar 35 renounces construction of a 57.5 MW solar plant in Huelva as it interferes with the future Seville-Huelva high-speed rail route. The Direct...
Renewable energy developers and photovoltaic sector companies in Huelva
Savanna Power Solar 9 withdraws from building a 59 MW solar plant in Huelva due to incompatibility with the future AVE Sevilla-Huelva. The Ministry accepts the ...
Renewable energy developers and photovoltaic sector in Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia