Authorization of 26.74 MW battery storage system to hybridize with solar plant in Cuenca
20 Jun 2026Effective: 20 Jun 2026109 views
Who is affected:
Promoting company Planta Solar OPDE 51 SL and renewable energy sector
Summary
Authorization is granted to build a 26.74 MW battery system next to the OPDE Belinchón 1 solar plant in Barajas de Melo (Cuenca). It enables solar energy storage to improve electricity supply.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Planta Solar OPDE 51, SL prior and construction authorization for a 26.74 MW battery storage module in Barajas de Melo (Cuenca), which will be hybridized with the existing 48.118 MW photovoltaic plant. The processing was conducted under the simplified procedure…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 31 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta Solar OPDE 51, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Hibridación OPDE Belinchón 1», de 26,74 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «OPDE Belinchón 1», de 48,118 MW de potencia instalada, en Barajas de Melo (Cuenca).
Authorization is granted to build a 26.74 MW battery module next to the OPDE Belinchón 2 solar plant in Barajas de Melo (Cuenca) to store photovoltaic energy. T...
Renewable energy developers, energy sector and Cuenca administrations
The Government authorizes Red Eléctrica de España to expand the Belinchón substation in Cuenca by installing a synchronous compensator to strengthen the nationa...
Red Eléctrica de España, SAU, and the national electricity sector (transmission network)
The Ministry authorizes Jinko Greenfield Spain 1 to build a 150 MW solar plant in Alosno and El Cerro de Andévalo (Huelva). Includes the necessary electrical ev...
Developer Jinko Greenfield Spain 1 SL, affected municipalities in Huelva and energy operators in the area
The Directorate General for Environmental Quality approves the environmental impact report of a 48 MW photovoltaic plant by Repsol in Puertollano for industrial...
Repsol Petróleo SA as promoter; energy industrial sector in Puertollano
The environmental impact statement for the FV Aceca solar park of 347.51 MW in Toledo, promoted by Iberdrola, is approved, which will be hybridized with the exi...
Iberdrola Generación Térmica, local administrations of Toledo and solar energy developers
The environmental impact statement for the Otero solar park in Segovia is approved, with 431 MW of power on 923 hectares. The approval includes strict condition...
Promoter Iberenova Promociones SAU, affected Segovian municipalities and renewable energy sector