Energy BOE Importance: 4/10

Environmental report approved for 26 MW photovoltaic solar plant in Cádiz hybridized with wind farm

31 Jul 2026 Effective: 31 Jul 2026 38 views
Who is affected:
Promoter Suresa Retama SLU, local administrations of Jerez and El Puerto de Santa María, renewable energy sector

Summary

The environmental impact report is approved for installing a 26 MW solar plant in Jerez de la Frontera and El Puerto de Santa María, which will be combined with the Alíjar II wind farm.

Detailed analysis PRO

The Directorate General for Quality and Environmental Assessment issues a favorable simplified environmental impact report for the PSFV Alíjar photovoltaic plant (25.99 MW, 42.44 ha) in Cádiz, promoted by Suresa Retama SLU. The project will be hybridized with the existing PE Alíjar II wind farm, evacuating energy throu…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 15 de julio de 2026, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula informe de impacto ambiental del proyecto «Módulo de generación fotovoltaica PSFV Alíjar, para su hibridación con el Parque Eólico existente PE Alíjar II, y para su infraestructura de evacuación, en la provincia de Cádiz».

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations