Key data
| Regulation | Resolution of October 27, 2026, from the General Directorate for Energy Planning and Coordination |
|---|---|
| Publication in BOE | November 14, 2026 |
| Entry into force | November 15, 2026 |
| Modified standard | Royal Decree 243/2009, of February 27 |
| European basis | Commission Decision (EU) 2026/2209 (published in the OJEU on October 2, 2026) |
| Affected sections | A-1 and B-1 of the uniform monitoring and control document |
| Main change | Inclusion of the registration number of the initial authorization in sections A-1 and B-1 |
| Affected parties | Operators and authorities managing radioactive waste and spent nuclear fuel transfers between EU countries |
| Category | Energy |
| Year | 2026 |
Nuclear operators moving radioactive waste or spent nuclear fuel between countries in the European Union have a new documentary obligation as of November 15, 2026. The Resolution of October 27, 2026 from the General Directorate for Energy Planning and Coordination amends the annex of the Royal Decree 243/2009, of February 27, to incorporate the changes required by the Commission Decision (EU) 2026/2209, published in the Official Journal of the European Union on October 2, 2026.
The change is technical but with direct operational consequences: from now on, the control form must include the registration number of the initial authorization in its sections A-1 and B-1. Without this data correctly completed, the transfer documentation will not be compliant with current regulations.
What does this regulation establish?
The resolution modifies the uniform monitoring and control document for radioactive waste and spent nuclear fuel transfers, which is the standard form that operators must complete for each cross-border movement within the EU or to or from outside the Community.
The specific change consists of adding the registration number of the initial authorization in sections A-1 and B-1 of the document. This allows competent authorities to associate each individual transfer with its original authorization, improving traceability and control of movements.
| Element | Before (until 14/11/2026) | After (from 15/11/2026) |
|---|---|---|
| Section A-1 of the uniform document | No reference to the registration number of the initial authorization | Includes the registration number of the initial authorization |
| Section B-1 of the uniform document | No reference to the registration number of the initial authorization | Includes the registration number of the initial authorization |
| Transfer traceability | Link to authorization not systematized in the form | Direct and explicit link to the original authorization |
The modification is a technical adaptation of Spanish regulations to an already published European decision. It does not introduce new substantive obligations or new authorization procedures: it only updates the format of the control document to align it with the European standard.
Economic and operational impact
The direct economic impact of this modification is low in terms of unit cost, but can have relevant operational consequences if not managed in time. The points of attention are:
- Update of documentary templates: Internal models of transfer forms must be reviewed to incorporate the new field in sections A-1 and B-1. If document management systems or specific software are used, it is necessary to update the digital forms.
- Risk of non-compliance: A transfer documented with the previous form (without the registration number of the initial authorization) may be considered non-compliant by competent authorities, which could generate delays, requests or blocks in the operation.
- Coordination with counterparts: In transfers between Member States, both parties must use the updated document. If the foreign counterpart has not updated its form, a documentary discrepancy may arise.
- Improvement of legal certainty: In the long term, the inclusion of the registration number of the initial authorization facilitates audits and reduces administrative burden in inspections, by allowing clearer traceability between transfers and authorizations.
Who does it affect?
- Nuclear operators carrying out radioactive waste transfers between EU Member States.
- Operators managing spent nuclear fuel in cross-border movements within or outside the European Community.
- Competent authorities responsible for monitoring and controlling these transfers (in Spain, the Nuclear Safety Council and the General Directorate for Energy Planning and Coordination).
- Regulatory compliance and documentation managers in nuclear energy sector companies.
- Radioactive waste managers operating in facilities with international transfer activity.
Practical example
A Spanish nuclear operator transferring low-activity radioactive waste to a treatment facility in France must complete the uniform monitoring and control document for each transfer operation.
Until November 14, 2026, sections A-1 and B-1 of that form did not require the inclusion of the registration number of the initial authorization that covers the operation. As of November 15, 2026, that registration number is a mandatory field in both sections.
If the operator uses a document management system with predefined templates and does not update the form before the next transfer, the documentation presented to competent authorities—both Spanish and French—will not be compliant with the new standard. This can result in a request for correction, delays in transfer authorization or, in the worst case, temporary paralysis of the operation until the documentation is correct.
The solution is simple: update the form template before the next transfer and incorporate the registration number of the initial authorization in sections A-1 and B-1.
What should companies do now?
- Review the uniform document templates: Verify that internal transfer forms (paper and digital) incorporate the registration number of the initial authorization in sections A-1 and B-1, as required by the resolution from November 15, 2026.
- Update document management systems: If specific software is used for managing nuclear transfers, contact the provider to confirm that the form update is already available or schedule an urgent update.
- Communicate the change to counterparts: Inform partners and recipients in other EU Member States about the modification, to ensure that both parties use the updated form in upcoming transfers.
- Verify Commission Decision (EU) 2026/2209: Consult the full text of the Commission Decision (EU) 2026/2209 in the OJEU (published on October 2, 2026) to confirm that the internal adaptation is complete and consistent with the European standard.
- Archive updated documentation: Keep the new correctly completed forms to facilitate future audits and demonstrate compliance with competent authorities.
Frequently asked questions
What exactly changes in the radioactive waste transfer form from November 2026?
Sections A-1 and B-1 of the uniform monitoring and control document must now include the registration number of the initial authorization. This field did not exist in the previous form. The change applies from November 15, 2026, one day after the resolution is published in the BOE.
What Spanish regulation does this resolution modify and what is its European basis?
The resolution modifies the annex of Royal Decree 243/2009, of February 27, which regulates the monitoring and control of radioactive waste and spent nuclear fuel transfers between Member States or to or from outside the Community. The European basis is Commission Decision (EU) 2026/2209, published in the OJEU on October 2, 2026.
When does the new form come into force and is there an adaptation period?
The new form applies from November 15, 2026, the day after its publication in the BOE. There is no transitional period: the resolution does not establish an adaptation period, so operators must use the updated form from that date in all transfers.
What happens if a transfer is submitted with the previous form after November 15, 2026?
A form without the registration number of the initial authorization in sections A-1 and B-1 will not be compliant with current regulations. This can result in requests for correction, operational delays or blocks by competent authorities. The resolution does not specify concrete sanctions, but documentary non-compliance can affect the validity of the transfer.
Does this change only affect transfers within the EU or also those going outside?
Royal Decree 243/2009—and therefore this modification—applies to both transfers between EU Member States and transfers from or to outside the Community. The new requirement for the registration number of the initial authorization in sections A-1 and B-1 is applicable in all these cases.
Official source
Consult complete regulation in official source
Notice: This article is for informational purposes only and does not constitute legal advice. For specific decisions, consult a qualified professional. Source: https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-23825