Favorable environmental report for new electrical line Lugo-Asturias: what it means for Viesgo in 2026
Viesgo Distribución Eléctrica obtains favorable environmental report for its LAT link between Lugo and Asturias, with 22...
12 Articles
Viesgo Distribución Eléctrica obtains favorable environmental report for its LAT link between Lugo and Asturias, with 22...
Order PJC/872/2026 corrects scores and order of approved candidates in the Judicial Assistance Corps in Asturias and Cat...
€3.74M in grants to repair municipal infrastructure damaged by forest fires in summer 2025. Provincial Councils of Aragó...
Red Eléctrica installs a 250 MVA synchronous compensator at the Santa María de Grado substation (400 kV, Asturias). Urge...
Llanes, Gijón, Avilés, Santiago de Compostela and Basauri are now tight rental markets as of July 30, 2026. New contract...
La Barca Energía wins 320 MW at the Narcea 400 kV node with a guarantee of €38.4 M. Key aspects of the tender, competito...
The EIA of the Northern Access to Oviedo (8,322 m, Alternative 4) is approved in July 2026 after almost a decade of proc...
Asturias raises fines for mining violations up to €600,000 and links definitive closures to the start of concession expi...
480M€ from the Recovery and Resilience Mechanism finance energy rehabilitation of public buildings in Asturias. Key dead...
The Municipality of Gijón is calling for 3 Technical Engineer positions (2 IT + 1 Surveying) through competitive examina...
Arena Green Power withdraws from its 50 MW wind farm in Asturias for failing to obtain the EIA before the RDL 23/2020 de...
FADE Asturias joins the CIRCE Network as an Entrepreneur Support Point: free processing of the DUE, legal and tax advice...