Synchronous Compensator in Cabra (Córdoba): Red Eléctrica Expands 400 kV Substation in 2026
Red Eléctrica installs a 250 MVA synchronous compensator at the Cabra substation (400 kV, Córdoba). Authorizations grant...
12 Articles
Red Eléctrica installs a 250 MVA synchronous compensator at the Cabra substation (400 kV, Córdoba). Authorizations grant...
7 companies lose their regional incentives for failing to comply with aid conditions under Law 50/1985. Discover what we...
The Cádiz City Council announces 59 public employment positions in 2026: Local Police, Architects, Social Workers and mo...
The Granada Provincial Council announces 13 Tax Management Agent positions: 12 in open competition and 1 for persons wit...
The Córdoba Provincial Council announces 8 fixed-term labor positions: 4 Caregiver and 4 General Services. Application d...
The Almería Provincial Council is calling for over 40 technical positions through competitive examination. The applicati...
The Provincial Council of Seville announces 2 Technical Industrial Engineer positions through competitive examination. A...
The Andalusian Center for Comprehensive Training in Leisure Industries in Mijas is established as a National Reference C...
The Municipality of Aguilar de la Frontera convenes 1 position of Technical Architect through open opposition. Applicati...
22 candidates for the Judicial Assistance Corps in Andalusia receive assignments starting September 1, 2026. Deadline fo...
Gestenia Energía obtains authorization to hybridize its 46.2 MW solar plant with a 39.6 MW BESS under the accelerated pr...
Urso Solar obtains authorization to hybridize its Don Rodrigo II photovoltaic plant (45.6 MW) with a 39.6 MW battery in ...