Los Guájares Hydroelectric Plant: 357 MW Authorized in Granada
Construction of the reversible Los Guájares hydroelectric plant authorized in Granada with 356.93 MW of generation and 3...
12 Articles
Construction of the reversible Los Guájares hydroelectric plant authorized in Granada with 356.93 MW of generation and 3...
A 26.74 MW battery authorized to hybridize with the Montesol solar plant (41.6 MW) in Teruel. Key aspects of the procedu...
Planta FV 115 SL obtains authorization for a 19,993 MW battery hybridized with the Castor solar plant (49.99 MW) in Huec...
Naturgy Renewables obtains authorization to install a 19.8 MW battery module alongside its 48.8 MW solar plant in Tabern...
FV100 plant obtains authorization for a 19,993 MW BESS hybridized with its 49,989 MW solar plant in Valdelosa (Salamanca...
Authorization of 26.74 MW battery to hybridize with Los Belos solar park (41.6 MW) in Zaragoza. Keys to the simplified p...
Enel Green Power obtains authorization to install a 17.5 MW battery next to the Tesouro wind farm in As Pontes (A Coruña...
A 26.74 MW battery authorized to hybridize with the Los Arcos solar plant (43.90 MW) in Andorra (Teruel). Simplified pro...
Khons Sun Power obtains authorization to build a 176.44 MW battery alongside its 224.4 MW solar plant in Toledo. Key asp...
Ictio Solar Berenice obtains authorization for a 19.96 MW battery that will hybridize with its 47.19 MW solar plant in A...
Ictio Solar Auriga obtains authorization for a 19.96 MW battery that will hybridize with its 47.19 MW solar plant in Alc...
Naturgy Renovables obtains authorization to install a 19.8 MW battery system in Tabernas (Almería), hybridized with its ...