Key data
| Regulation | Resolution of June 25, 2026, from the General Directorate of Energy Policy and Mines |
|---|---|
| Publication | July 20, 2026 |
| Effective date | July 20, 2026 |
| Beneficiary company | Jade Sostenible, SL |
| Battery module capacity | 39.6 MW installed |
| Existing solar plant capacity | 46.2 MW installed |
| Location | Alcalá de Guadaíra (Seville) |
| Evacuation infrastructure | Underground line at 30 kV to switching center, connecting to Don Rodrigo 400 kV substation of Red Eléctrica de España |
| Applicable regulatory framework | Royal Decree 997/2025, of November 5, on urgent measures to strengthen the electrical system |
| Category | Energy |
| Year | 2026 |
Jade Sostenible, SL can now build a 39.6 MW battery storage module alongside its 46.2 MW photovoltaic solar park in Alcalá de Guadaíra (Seville). The Resolution of June 25, 2026 from the General Directorate of Energy Policy and Mines grants both prior administrative authorization and administrative construction authorization, published in the BOE on July 20, 2026.
What is relevant is not just this specific project: it is the procedure that makes it possible. The resolution is covered by the Royal Decree 997/2025, of November 5, which establishes urgent measures to strengthen the electrical system, including a simplified procedure and exemption from environmental impact assessment for storage projects hybridized with existing renewable installations.
What does this regulation establish?
The resolution grants two simultaneous authorizations to Jade Sostenible, SL:
- Prior administrative authorization: recognizes the viability of the project and enables the start of construction procedures.
- Administrative construction authorization: permits physical execution of the battery module works and its evacuation infrastructure.
The project consists of hybridizing the «Jade» photovoltaic solar park—already in operation with 46.2 MW—with a new 39.6 MW battery storage module. Energy evacuation will be carried out through an underground line at 30 kV to a switching center, leveraging existing evacuation infrastructure to the Don Rodrigo 400 kV substation of Red Eléctrica de España.
The framework that makes this accelerated processing possible is Royal Decree 997/2025, which introduced a specific simplified procedure for storage projects hybridized with already-authorized renewable installations. This decree also establishes exemption from environmental impact assessment for this type of project, eliminating one of the main administrative bottlenecks in the sector.
During the public information period, no objections were received, and none of the consulted bodies expressed opposition to the project.
Economic and operational impact
For the renewable sector, this resolution has implications beyond Jade Sostenible:
- Validation of the simplified procedure under RD 997/2025: it is one of the first resolutions applying this accelerated framework for solar-storage hybridization. It confirms that the procedure works and that environmental exemption is operational.
- Reduction of administrative timelines: by avoiding environmental impact assessment and processing through simplified channels, developers can significantly shorten the time between project and construction.
- Leveraging existing infrastructure: reusing the evacuation line and connection to the Don Rodrigo 400 kV substation reduces civil works costs and avoids new grid authorizations.
- Market signal: hybridizing a 46.2 MW plant with 39.6 MW of batteries represents a storage-to-generation ratio of 85.7%, indicating a commitment to firmness and energy management capacity.
Who does it affect?
- Renewable energy developers with authorized photovoltaic or wind plants studying the addition of battery storage.
- Hybridization project developers seeking to use the simplified procedure under Royal Decree 997/2025.
- Legal and technical advisors in the energy sector processing administrative authorizations before the General Directorate of Energy Policy and Mines.
- Investors and infrastructure funds with positions in renewable assets in Spain, evaluating the potential of adding storage to existing plants.
- Engineering and construction companies specialized in energy storage installations and evacuation lines.
- Electrical system operators interested in strengthening grid stability through renewable-storage hybridization.
Practical example
A developer with a photovoltaic plant of similar capacity to Jade Sostenible—say 40-50 MW already in operation—wanting to add a battery module to hybridize it can follow exactly the same path validated by this resolution:
- Use the simplified procedure under Royal Decree 997/2025, avoiding environmental impact assessment.
- Design the battery module evacuation leveraging existing grid infrastructure—as Jade Sostenible did with its 30 kV line and Don Rodrigo 400 kV substation—reducing costs and additional procedures.
- Submit the project to the General Directorate of Energy Policy and Mines to obtain both prior administrative authorization and construction authorization in a single procedure.
In the case of Jade Sostenible, the result is a hybridized system with 85.7 MW combined capacity (46.2 MW solar + 39.6 MW batteries), capable of managing grid injection more flexibly and reliably, and without facing opposition during the public information process.
What should companies do now?
- Review Royal Decree 997/2025: if you have an operating renewable plant and are studying adding storage, analyze whether your project meets requirements for the simplified procedure and environmental assessment exemption.
- Audit existing evacuation infrastructure: evaluate whether your current evacuation line can also absorb battery module energy, as Jade Sostenible did with its 30 kV line. Reusing it reduces costs and timelines.
- Identify the connection substation: confirm with the grid operator (REE or distribution operator) available capacity at the reference substation for your hybridized project.
- Prepare documentation for dual authorization: the resolution grants both prior and construction authorization simultaneously. Ensure your file includes all technical documentation needed for both.
- Monitor similar new resolutions: each new authorization published in the BOE under RD 997/2025 provides precedents on technical criteria, timelines, and requirements that can guide your own project.
Frequently asked questions
What is the simplified procedure under Royal Decree 997/2025 and what advantages does it have?
Royal Decree 997/2025, of November 5, on urgent measures to strengthen the electrical system, establishes a simplified procedure for battery storage projects hybridized with existing renewable installations. Its main advantage is exemption from environmental impact assessment, eliminating one of the slowest steps in the authorization process. Jade Sostenible used this procedure to obtain both prior administrative authorization and construction authorization for its 39.6 MW module in a single resolution.
How is energy from the authorized battery module in Alcalá de Guadaíra evacuated?
Evacuation is carried out through an underground line at 30 kV to a switching center, leveraging existing evacuation infrastructure from the «Jade» solar park to the Don Rodrigo 400 kV substation of Red Eléctrica de España. This reuse of existing infrastructure is key to reducing costs and avoiding new grid authorizations.
What is the storage-to-generation ratio of the Jade project?
The 39.6 MW battery module will be hybridized with the «Jade» 46.2 MW photovoltaic solar plant, representing a storage ratio of 85.7% relative to installed generation capacity. The combined capacity of the hybridized system will be 85.8 MW.
Was there opposition to the project during processing?
No. During the public information period, no objections were received, and none of the consulted bodies expressed opposition to the project. This result strengthens the authorization and may be a relevant indicator for developers evaluating similar projects in the same area or with similar characteristics.
What companies or projects can use the same procedure as Jade Sostenible?
Any developer with an already-authorized renewable installation wanting to hybridize it with a battery storage module can study using the simplified procedure under Royal Decree 997/2025. The project must meet technical and administrative requirements established in that decree, including connection to existing evacuation infrastructure whenever possible.