Naturgy obtains authorization for a 54.6 MW solar park hybridized with wind in Albacete
The Ministry authorizes Naturgy Vento a 54.6 MW photovoltaic park in El Bonillo (Albacete) that will be hybridized with an existing 51 MW wind park.
Technology and digital sector regulations
1918 regulations
Get email or Telegram alerts every time a new Technology regulation is published. From €9.99/month, no lock-in.
Set up personalized alerts and receive the regulations that affect you directly via email or Telegram.
Activate PRO alerts