Natural gas prices 2024 for electric generators in Canary Islands, Balearic Islands and non-peninsular territories
10 Apr 202693 views
Who is affected:
Electricity generating companies in non-peninsular territories (Canary Islands, Balearic Islands, Ceuta, Melilla)
Summary
Natural gas prices for 2024 are set to settle the costs of generator groups in non-peninsular territories such as Canary Islands and Balearic Islands. It affects the remuneration of the electrical system in these areas.
Detailed analysis
PRO
The General Directorate of Energy Policy and Mines establishes the natural gas fuel prices for fiscal year 2024 that will be applied in the final settlement of generator groups located in non-peninsular territories, including Canary Islands, Balearic Islands, Ceuta and Melilla. These prices are necessary to calculate t…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 27 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se fijan los precios del combustible gas natural del año 2024 a aplicar en la liquidación de dicho ejercicio de los grupos generadores ubicados en los territorios no peninsulares.
The Ministry authorizes Bianor Solar to build a 28.37 MW battery storage system alongside its existing photovoltaic plant in Utrera. The installation will impro...
Renewable energy sector companies, solar plant developers and grid operators
The environmental impact report is approved for a 20 kV power line between A Fonsagrada (Lugo) and Santa Eulalia de Oscos (Asturias). The project will improve t...
Viesgo Distribución Eléctrica SL and municipalities of A Fonsagrada (Lugo) and Santa Eulalia de Oscos (Asturias)
The Ministry authorizes Naturgy Vento to build a 49.35 MW photovoltaic plant in El Bonillo (Albacete) that will share infrastructure with an already existing wi...
Naturgy Vento SAU, local and regional administrations of Albacete and Castilla-La Mancha
Savanna Power Solar 10 withdraws from building a 60 MW photovoltaic plant in Trigueros (Huelva) as it interferes with the future Seville-Huelva high-speed rail ...
Renewable energy developers and photovoltaic sector in Huelva
Planta Solar OPDE 25 is authorized to build a 43.9 MW battery storage system alongside its Covatillas 3 photovoltaic park in Castillejo de Iniesta (Cuenca). The...
Promoting company Planta Solar OPDE 25 SL and renewable energy sector in Cuenca