Amendment to the Energy Annex of the European Economic Area Agreement
16 Apr 2026Effective: 05 Dec 202569 views
Who is affected:
Energy companies and operators with activity in European Economic Area countries
Summary
The EEA Joint Committee updates energy rules applicable to European Economic Area countries. This change adapts common energy regulation between the EU, Norway, Iceland and Liechtenstein.
Detailed analysis
PRO
Decision 286/2025 of the EEA Joint Committee amends Annex IV on energy of the EEA Agreement, incorporating new European energy regulations into the legal framework applicable to EEA Member States not belonging to the EU. This update ensures regulatory consistency between the European Union and EEA countries (Norway, Ic…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
OJ:L_202600625: Decisión del Comité Mixto del EEE n.o 286/2025, de 5 de diciembre de 2025, por la que se modifica el anexo IV (Energía) del Acuerdo EEE [2026/625]
La empresa Savanna Power Solar 9 renuncia a construir una planta solar de 59 MW en Huelva por incompatibilidad con el futuro AVE Sevilla-Huelva. El Ministerio a...
Promotores de energías renovables y sector fotovoltaico en Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection