Public utility declaration for Orzar wind farm of 52 MW in A Coruña
21 May 2026Effective: 27 Apr 2026144 views
Who is affected:
Landowners in Carballo, Tordoia and Val do Dubra (A Coruña) and Greenalia company
Summary
The Orzar wind farm is officially authorized in municipalities of A Coruña with 52 MW of power capacity. This declaration enables the expropriation of land necessary for its construction.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants the public utility declaration to the PE Orzar wind farm, promoted by Greenalia Wind Power Orzar SLU, with 52 MW of installed capacity in the municipalities of Carballo, Tordoia and Val do Dubra (A Coruña). This declaration is a key administrative step that ena…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 27 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Greenalia Wind Power Orzar, SLU, la declaración, en concreto, de utilidad pública para el parque eólico «PE Orzar», de 52 MW de potencia instalada, y su infraestructura de evacuación, en Carballo, Tordoia y Val do Dubra (A Coruña).
Errors are corrected in the authorization of a 45 MW photovoltaic solar plant and a 5 MW battery system in Zaragoza, which will be hybridized with an existing w...
Molinos del Moncayo, SL and renewable energy sector operators in Aragón
Official prices for fuel oil, diesel, gasoil and coal are set to settle electricity generation in the Canary Islands, Balearic Islands, Ceuta and Melilla in the...
Operators of electricity generator units in the Canary Islands, Balearic Islands, Ceuta and Melilla
Redexis Infraestructuras is authorized to build a new connection in the Zaragoza-Calatayud gas pipeline to introduce biomethane into the network. This promotes ...
Redexis Infraestructuras SL, biomethane producers and gas consumers in Calatorao (Zaragoza)
Sargao Energy is authorized to install a large-capacity energy storage system in Picassent, Valencia. The installation will connect to the 132 kV electrical gri...
Sargao Energy SL company, energy sector and municipality of Picassent (Valencia)
Official values are set for greenhouse gas emissions during the life cycle of electricity used by motorcycles and electric cars. These data are key to calculati...
Electric vehicle manufacturers, charging operators, corporate fleets and mobility sector
Technical errors in a European regulation related to energy emergency measures are corrected. It affects current regulations without substantial changes to the ...
Energy sector companies and operators subject to EU Regulation 2024/1735