Energy BOE Importance: 3/10

Correction of errors in the authorization of a 49 MW photovoltaic solar park in Valladolid hybridized with wind energy

19 May 2026 Effective: 07 May 2026 13 views
Who is affected:
Parques Eólicos San Lorenzo, SLU and municipalities of Castromonte, Peñaflor de Hornija and Torrelobatón

Summary

Errors are corrected in the authorization of a 49.11 MW photovoltaic solar module in Castromonte, Peñaflor de Hornija and Torrelobatón (Valladolid), declared of public utility.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines corrects material errors detected in the resolution of 16 April 2026, which granted Parques Eólicos San Lorenzo, SLU, prior administrative and construction authorization for the San Lorenzo A photovoltaic solar module of 49.11 MW. This installation will be hybridized …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 7 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 16 de abril de 2026, por la que se otorga a Parques Eólicos San Lorenzo, SLU, autorización administrativa previa y autorización administrativa de construcción para el módulo solar fotovoltaico San Lorenzo A, de 49,11 MW de potencia instalada, para su hibridación con el parque eólico existente San Lorenzo A, de 48,75 MW, y para una parte de sus infraestructuras de evacuación, en Castromonte, Peñaflor de Hornija y Torrelobatón (Valladolid), y se declara, en concreto, de utilidad pública.

Related regulations