Correction of errors in the authorization of a 49 MW photovoltaic solar park in Valladolid hybridized with wind energy
19 May 2026Effective: 07 May 202676 views
Who is affected:
Parques Eólicos San Lorenzo, SLU and municipalities of Castromonte, Peñaflor de Hornija and Torrelobatón
Summary
Errors are corrected in the authorization of a 49.11 MW photovoltaic solar module in Castromonte, Peñaflor de Hornija and Torrelobatón (Valladolid), declared of public utility.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines corrects material errors detected in the resolution of 16 April 2026, which granted Parques Eólicos San Lorenzo, SLU, prior administrative and construction authorization for the San Lorenzo A photovoltaic solar module of 49.11 MW. This installation will be hybridized …
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 7 de mayo de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 16 de abril de 2026, por la que se otorga a Parques Eólicos San Lorenzo, SLU, autorización administrativa previa y autorización administrativa de construcción para el módulo solar fotovoltaico San Lorenzo A, de 49,11 MW de potencia instalada, para su hibridación con el parque eólico existente San Lorenzo A, de 48,75 MW, y para una parte de sus infraestructuras de evacuación, en Castromonte, Peñaflor de Hornija y Torrelobatón (Valladolid), y se declara, en concreto, de utilidad pública.
La empresa Savanna Power Solar 9 renuncia a construir una planta solar de 59 MW en Huelva por incompatibilidad con el futuro AVE Sevilla-Huelva. El Ministerio a...
Promotores de energías renovables y sector fotovoltaico en Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection