Energy BOE Importance: 3/10

Correction of errors in the authorization of the Galatea II solar plant of 92.4 MW in Madrid

23 Apr 2026 Effective: 16 Apr 2026 38 views
Who is affected:
Promoting company Green Capital Development 57 SLU and landowners affected in Madrid

Summary

Errors are corrected in the resolution that authorized the construction of the Galatea II photovoltaic plant in Pezuela de las Torres and Corpa (Madrid). The installation has 92.4 MW of power and was declared of public utility.

Detailed analysis PRO

This resolution corrects material errors detected in the prior administrative authorization and construction permit granted in March 2025 to Green Capital Development 57, SLU for the Galatea II photovoltaic plant. The installation, with 92.4 MW of power, is located in the Madrid municipalities of Pezuela de las Torres …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 16 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 17 de marzo de 2025, por la que se otorga a Green Capital Development 57, SLU, autorización administrativa previa de las modificaciones y autorización administrativa de construcción para la instalación fotovoltaica Galatea II, de 92,4 MW de potencia instalada, y su infraestructura de evacuación, en Pezuela de las Torres y Corpa (Madrid), y se declara, en concreto, su utilidad pública.