Public Sector BOE Importance: 2/10

Agreement to repair the Louro river wastewater collector in Tui (Pontevedra)

25 Nov 2026 0 views
Who is affected:
Municipalities of Tui, Mos, Porriño and Salceda de Caselas (Pontevedra) and their citizens

Summary

The Miño-Sil River Basin Authority and the Louro Water Consortium agree to finance and execute repair works on the collector connected to the Guillarei treatment plant in Tui.

Detailed analysis PRO

The Miño-Sil River Basin Authority and the Louro Water Consortium formalize an agreement to repair the general interceptor collector of the Louro river at its connection with the EDAR Guillarei, in Tui (Pontevedra). The problem arose in 2019 when ground subsidence was detected over the collector, with significant struc…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 10 de noviembre de 2026, de la Confederación Hidrográfica del Miño-Sil, O.A., por la que se publica el Convenio con el Consorcio de Aguas del Louro, para la financiación, ejecución y entrega de las obras de reparación del colector del Louro en su conexión con la Estación Depuradora de Aguas Residuales de Guillarei, en Tui (Pontevedra).

Related regulations

Almost there