Catalonia authorizes an AKS-1 model low voltage electrical measurement transformer
27 Nov 2026Effective: 27 Nov 20262 views
Who is affected:
Laboratorio Electrotécnico SCCL and customers who install the AKS-1 transformer in electrical networks
Summary
The Generalitat de Cataluña authorizes Laboratorio Electrotécnico to install its AKS-1 transformer in the electrical network. The authorization is valid for five years and requires verification prior to each installation.
Detailed analysis
PRO
The Dirección General de Industria of Catalonia grants administrative authorization to Laboratorio Electrotécnico, SCCL to market and install the AKS-1 current transformer in the Spanish electrical network. The equipment operates at low voltage (up to 0.72 kV) with primary currents from 50 to 2500 A and accuracy classe…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 26 de octubre de 2026, de la Dirección General de Industria, del Departamento de Empresa y Trabajo, por la que se autoriza para su uso e instalación a la red eléctrica, de un transformador de intensidad para la medida en baja tensión, modelo AKS-1, a favor de Laboratorio Electrotécnico, SCCL.
Repsol has challenged in court the rules set by the CNMC to settle the electricity market during the blackout on April 28 and 29, 2025. Interested parties are n...
Electricity retailers and market agents affected by the April 2025 power outage settlement
Repsol has appealed before the National Court the settlement criteria of the electrical system during the days of the major blackout. Interested parties have 9 ...
Electricity retailers, generators and market agents affected by the April 2025 blackout
The CNMC notifies interested parties that they may appear in the judicial appeal against the electrical settlement criteria for the days of the major blackout. ...
Electricity retailers, generators and electrical market agents affected by the April 2025 blackout
Gasificadora Regional Canaria challenges before the Audiencia Nacional the circular that sets how gas distribution is remunerated. Interested parties are notifi...
Natural gas distributors, energy sector operators and industrial consumers
The LNG plant at the El Musel port in Gijón transitions from a temporary regime to permanent integration into the national gas system, strengthening gas supply ...
Enagás, Musel Energy Hub SLU, gas operators, industrial natural gas consumers
Minimum fill levels for underground natural gas storage facilities are set for 2027, maintaining 90% as the target in response to the energy crisis and rising g...
Natural gas traders and direct market consumers with minimum inventory obligations