Catalonia authorizes Circutor TDH6 current transformer for installation in the electrical grid
12 Aug 2026Effective: 12 Aug 202689 views
Who is affected:
Circutor SA, electrical installers and companies using low voltage measurement equipment
Summary
The Generalitat of Catalonia authorizes the use of the Circutor TDH6 measurement transformer in the electrical grid for 5 years. The device measures current intensity in low voltage for electrical consumption control.
Detailed analysis
PRO
The General Directorate of Industry of Catalonia grants administrative authorization to Circutor, SA to market and install its TDH6 current transformer model in the Spanish electrical grid. The authorization covers nine product versions with transformation ratios between 150/5 and 800/5 amperes, for use in low voltage …
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 14 de julio de 2026, de la Dirección General de Industria del Departamento de Empresa y Trabajo, por la que se autoriza para su uso e instalación a la red eléctrica, de un transformador de intensidad para la medida en baja tensión, marca Circutor, modelo TDH6, a favor de Circutor, SA.
ENRESA will finance with 545,200 € a research project with CSIC to classify low and medium activity radioactive waste using artificial intelligence and neutron-...
ENRESA, CSIC-IFIC, nuclear sector and radioactive waste management in Spain
Environmental impact report approved for changing part of the high-voltage power line route in Madrid, combining overhead and underground sections to protect ec...
Promoter Envatios Promoción XIX SL, municipalities of Morata de Tajuña and Arganda del Rey
The Directorate General for Energy Policy denies Iberdrola the FV Aceca solar park in Toledo following an unfavorable environmental impact assessment. Grid conn...
Iberdrola Generación Térmica, SL, and major solar park developers in Spain
The Generalitat of Catalonia expands the authorization to Dishelec 65 to install high-voltage measurement transformers, adding the 132 kV version to the previou...
Electrical sector companies, grid operators and high-voltage measurement equipment distributors
The Ministry approves the environmental impact of installing 1,446 m of fencing on the Ciudad Real-Badajoz railway line as it passes through Cabeza del Buey. Th...
Adif, railway construction contractors and the municipality of Cabeza del Buey (Badajoz)
The CNMC approves the rules for electricity consumers to access the grid with flexible permits when firm capacity is not available. It especially affects energy...