Authorization to inject biomethane into the Segovia Norte pipeline in Carbonero el Mayor
26 Sep 2026Effective: 26 Sep 202673 views
Who is affected:
Redexis Infraestructuras, SL and the municipality of Carbonero el Mayor (Segovia)
Summary
Redexis Infraestructuras is authorized to install a new connection in the Segovia Norte pipeline to inject biomethane in Carbonero el Mayor (Segovia). The project has a budget of approximately 50,800 euros.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Redexis Infraestructuras, SL administrative authorization, approval of the execution project and declaration of public utility for a new position in the Segovia Norte pipeline intended for biomethane injection in Carbonero el Mayor (Segovia). The installation c…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 8 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Redexis Infraestructuras, SL, autorización administrativa, aprobación del proyecto de ejecución y declaración, en concreto, de utilidad pública de las instalaciones del «Proyecto de nueva posición sobre el gasoducto “Segovia Norte” para inyección de biometano en Carbonero el Mayor (Segovia)».
Material errors are corrected in electric and collaborative mobility sheets of the standardized energy efficiency measures catalogue. It affects those requestin...
Companies, public entities and individuals requesting Energy Saving Certificates for vehicle renewal
An error in the resolution that denied the Satrebares wind farm is corrected: several municipalities were assigned to the wrong province. The correction reassig...
Maracaibo Solar, SL, promoter of the Satrebares wind farm in Galicia
Errors are corrected in the authorization of a hybrid photovoltaic installation with a 50 MW battery in Altarejos (Cuenca): the company name and the power of th...
GR Bañuela Renovables, SLU, owner of the hybrid solar installation in Altarejos (Cuenca)
The Ministry authorizes Red Eléctrica to build a new 400 kV substation in Zamora with five equipped positions. The installation is declared of public utility an...
Red Eléctrica de España and municipalities of Moreruela de los Infanzones and Piedrahita de Castro (Zamora)
Red Eléctrica de España obtains permission to build a new 400 kV substation in Sagunto that will improve the electrical grid and supply the new industries of Pa...
Red Eléctrica de España, industries of Parc Sagunt and municipality of Sagunto (Valencia)
The CNMC establishes the annual remuneration of electricity distributors for 2023. The supply quality incentive will be calculated in a subsequent resolution.
Electricity distribution companies and, indirectly, electricity consumers