Energy BOE Importance: 3/10

Authorization to install 39.6 MW battery storage system next to Jade solar plant in Alcalá de Guadaíra (Seville)

20 Jul 2026 Effective: 20 Jul 2026 1 views
Who is affected:
Jade Sostenible, SL, and renewable energy sector with battery storage projects

Summary

The Ministry authorizes Jade Sostenible, SL, to build a 39.6 MW battery storage system to be hybridized with its existing solar park in Seville.

Detailed analysis PRO

The General Directorate of Energy Policy and Mines grants Jade Sostenible, SL, prior administrative and construction authorization for a 39.6 MW battery storage module in Alcalá de Guadaíra (Seville), which will be hybridized with the existing 46.2 MW photovoltaic plant. The project is subject to the simplified procedu…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 25 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Jade Sostenible, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Jade», de 39,6 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Jade», de 46,2 MW de potencia instalada, en Alcalá de Guadaíra (Sevilla).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations