Energy BOE Importance: 5/10

Authorization to build the reversible hydroelectric power plant Los Guájares in Granada with 357 MW capacity

28 Oct 2026 Effective: 28 Oct 2026 1 views
Who is affected:
Promoting company Hidroeléctrica Los Guájares, SLU, and affected Granada municipalities

Summary

The Government authorizes the construction of a large reversible hydroelectric power plant in Granada. The facility will be able to generate and store energy with a capacity of almost 357 MW.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Hidroeléctrica Los Guájares, SLU, prior authorization and construction permit for a reversible hydroelectric power plant in the Granada municipalities of Vélez de Benaudalla, El Pinar and Los Guájares. The facility will have 356.93 MW of turbining capacity and …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 16 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Hidroeléctrica Los Guájares, SLU, autorización administrativa previa y autorización administrativa de construcción para la central hidráulica reversible «Los Guájares», con una potencia de turbinación de 356,93 MW y una potencia de bombeo de 363,99 MW, y su infraestructura de evacuación, ubicada en Vélez de Benaudalla, El Pinar y Los Guájares (Granada).

Related regulations

Almost there