Authorization of 91 MW photovoltaic solar plant in Cáceres for Proyecto Fotovoltaico Guijo
11 Jun 2026Effective: 11 Jun 2026113 views
Who is affected:
Promoting company Proyecto Fotovoltaico Guijo SLU and municipalities of Calzadilla and Guijo de Coria (Cáceres)
Summary
Authorization is granted for the construction of a 91 MW solar plant in Calzadilla and Guijo de Coria (Cáceres). The installation includes electrical evacuation infrastructure.
Detailed analysis
PRO
The Dirección General de Política Energética y Minas grants prior administrative authorization to Proyecto Fotovoltaico Guijo, SLU for a 91 MW solar plant in Cáceres. The file has passed consultations with multiple bodies including ADIF, Red Eléctrica, Confederación Hidrográfica del Tajo and affected municipalities, wi…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 29 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Proyecto Fotovoltaico Guijo, SLU, autorización administrativa previa para la instalación fotovoltaica «FV Guijo», de 91 MW de potencia instalada, y sus infraestructuras de evacuación, en Calzadilla y Guijo de Coria (Cáceres).
The Ministry authorizes Iberdrola to add 30.9 MW of solar capacity to the Sierra del Romeral wind farm in Villacañas (Toledo), creating a 40 MW hybrid installat...
Iberdrola Renovables de Castilla-La Mancha and local administrations of Villacañas (Toledo)
The Ministry authorizes Red Eléctrica to execute a bypass at the Morata 400 kV substation to improve the electrical transmission network in Madrid. This allows ...
Owners of affected properties in Morata de Tajuña (Madrid) and Red Eléctrica de España
European subsidies are approved for payments to 26 electricity distribution companies for investments in network digitalization and electric vehicle charging po...
Electricity distribution companies with eligible investments in 2022
The Ministry denies Energías Renovables Yadisema SL authorization to build a 63.83 MW solar plant in Toledo due to expiration of grid access and connection perm...
Promoters of photovoltaic and renewable installations processing authorizations in Spain
Falck Renewables Power 3 withdraws from constructing a 121.5 MW solar park in Velilla de San Antonio and Loeches (Madrid) after receiving an unfavorable environ...
Renewable energy developers, photovoltaic investors and municipalities of Velilla de San Antonio and Loeches
Enresa is authorized to build a temporary storage facility for radioactive waste from the Vandellós I nuclear power plant, now decommissioned. The facility will...
Enresa, Nuclear Safety Council, local administrations and citizens in the Vandellós area