Authorization of 53 MW photovoltaic solar plant with storage in Rueda de Jalón (Zaragoza)
18 Apr 2026Effective: 31 Mar 202694 views
Who is affected:
Molinos del Ebro SA company and renewable energy sector in Aragón
Summary
Molinos del Ebro SA is authorized to build a 53.32 MW solar plant with 5 MW battery storage in Zaragoza, which will be combined with an existing wind farm of 49.95 MW.
Detailed analysis
PRO
The Dirección General de Política Energética y Minas grants prior administrative authorization to Molinos del Ebro SA to construct the El Llano Photovoltaic Solar Plant of 53.32 MW together with a battery energy storage system of 5 MW in Rueda de Jalón, Zaragoza. The project will be hybridized with the existing El Llan…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 31 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Molinos del Ebro, SA, autorización administrativa previa para el módulo solar fotovoltaico "Central Solar Fotovoltaica El Llano" de 53,32 MW de potencia instalada y para el módulo de almacenamiento con baterías "Almacenamiento Hibridación El Llano" de 5 MW de potencia instalada, y su infraestructura de evacuación, en Rueda de Jalón (Zaragoza), para su hibridación con el parque eólico existente "El Llano" de 49,95 MW.
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing