Authorization of 45 MW solar plant with batteries in Rueda de Jalón (Zaragoza) to hybridize with existing wind farm
04 May 2026Effective: 10 Mar 202687 views
Who is affected:
Molinos del Ebro SA company and municipality of Rueda de Jalón (Zaragoza)
Summary
Molinos del Ebro SA is authorized to install a 45 MW photovoltaic module and 5 MW batteries in Zaragoza, combining them with an already existing 50 MW wind farm.
Detailed analysis
PRO
The Dirección General de Política Energética y Minas grants prior administrative authorization to Molinos del Ebro SA to build the Valdejalón photovoltaic module of 45 MW and a battery storage system of 5 MW in Rueda de Jalón, Zaragoza. The project will be hybridized with the already operational Valdejalón wind farm of…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 10 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Molinos del Ebro, SA, autorización administrativa previa para el módulo fotovoltaico Valdejalón, de 45 MW de potencia instalada, el módulo de almacenamiento con baterías Valdejalón, de 5 MW de potencia instalada, y sus infraestructuras de evacuación, para hibridación con el parque eólico existente Valdejalón, de 50 MW, en Rueda de Jalón (Zaragoza).
La empresa Savanna Power Solar 9 renuncia a construir una planta solar de 59 MW en Huelva por incompatibilidad con el futuro AVE Sevilla-Huelva. El Ministerio a...
Promotores de energías renovables y sector fotovoltaico en Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection