Energy BOE Importance: 3/10

Authorization of 45 MW solar plant with batteries in Rueda de Jalón (Zaragoza) to hybridize with existing wind farm

04 May 2026 Effective: 10 Mar 2026 30 views
Who is affected:
Molinos del Ebro SA company and municipality of Rueda de Jalón (Zaragoza)

Summary

Molinos del Ebro SA is authorized to install a 45 MW photovoltaic module and 5 MW batteries in Zaragoza, combining them with an already existing 50 MW wind farm.

Detailed analysis PRO

The Dirección General de Política Energética y Minas grants prior administrative authorization to Molinos del Ebro SA to build the Valdejalón photovoltaic module of 45 MW and a battery storage system of 5 MW in Rueda de Jalón, Zaragoza. The project will be hybridized with the already operational Valdejalón wind farm of…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 10 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Molinos del Ebro, SA, autorización administrativa previa para el módulo fotovoltaico Valdejalón, de 45 MW de potencia instalada, el módulo de almacenamiento con baterías Valdejalón, de 5 MW de potencia instalada, y sus infraestructuras de evacuación, para hibridación con el parque eólico existente Valdejalón, de 50 MW, en Rueda de Jalón (Zaragoza).

Related regulations