The environmental impact assessment for the 'Picador' solar plant in Zaragoza is approved, featuring 45 MW of photovoltaic capacity and 5 MW of storage. The project may proceed subject to compliance with the established environmental conditions.
Detailed analysis
PRO
The Dirección General de Calidad y Evaluación Ambiental issues a favourable environmental impact declaration for the 'Picador' photovoltaic solar plant in Fuendejalón (Zaragoza), with 45 MW of installed capacity and 5 MW of grid-connected storage. This resolution is a key administrative step that legally enables the pr…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 11 de marzo de 2026, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula declaración de impacto ambiental del proyecto «Central solar fotovoltaica y de almacenamiento hibridación "Picador" de 45 MW de potencia instalada de tecnología fotovoltaica, y de 5 MW de almacenamiento con inyección de energía a la red, y su infraestructura de evacuación, Fuendejalón (Zaragoza)».
La empresa Savanna Power Solar 9 renuncia a construir una planta solar de 59 MW en Huelva por incompatibilidad con el futuro AVE Sevilla-Huelva. El Ministerio a...
Promotores de energías renovables y sector fotovoltaico en Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection