Public Sector BOE Importance: 2/10

Extension of agreement to repair a bridge over the Sil River in Toral de los Vados (León)

15 Aug 2026 Effective: 03 Aug 2026 36 views
Who is affected:
Municipality of Toral de los Vados and residents of the León municipality

Summary

The Miño-Sil River Basin Authority extends the budget of the agreement with the Municipality of Toral de los Vados to repair a bridge over the Sil River, increasing from 348,351 to 474,868 euros.

Detailed analysis PRO

This third amendment modifies the original agreement of June 2024 between the Miño-Sil River Basin Authority and the Municipality of Toral de los Vados for the repair of a crossing structure over the Sil River. The total budget is increased to 474,868.19 euros VAT included, compared to 348,351 euros from the second ame…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 4 de agosto de 2026, de la Confederación Hidrográfica del Miño-Sil, O.A., por la que se publica la tercera Adenda modificativa del Convenio con el Ayuntamiento de Toral de los Vados, sobre la financiación, ejecución y entrega de las obras de reparación de obra de paso sobre el río Sil en el término municipal de Toral de los Vados (León).

Related regulations