Key data
| Regulation | Resolution of 31 August 2026, from the General Directorate of Industrial Strategy and Small and Medium-Sized Enterprises |
|---|---|
| BOE Publication | 9 September 2026 |
| Start of deadlines | 10 September 2026 |
| Consultation deadlines | 30 days (3 projects) and 40 days (2 projects) |
| Affected sectors | Textiles, construction, funeral services, electrical installations, healthcare sector |
| Promoting body | AENOR — Spanish Association for Standardization |
| Category | Business Regulation |
| Year | 2026 |
| Texts available at | https://srp.une.org/ |
Five business sectors have a concrete opportunity—with an expiration date—to influence the technical standards that will regulate their activity. The General Directorate of Industrial Strategy has submitted to public information five UNE standard draft projects being processed by AENOR corresponding to August 2026, published in the BOE of 9 September 2026. The deadlines are counted from the day following that publication, that is, from 10 September 2026.
UNE standards are not always mandatory upon approval, but they frequently become mandatory references in public procurement, contracts with major clients, quality audits and, eventually, legal requirements. Participating now in the public consultation is the only way for affected companies to shape the technical content before it becomes fixed.
What does this regulation establish?
The resolution submits to public consultation the following five UNE standard draft projects. Each has a different deadline and affects a different sector:
| UNE standard draft project | Subject matter | Consultation deadline |
|---|---|---|
| Specifications for handling and classification of used textiles for reuse and recycling | Textile sector / circular economy | 40 days from 10/09/2026 |
| Terrazzo tiles for exterior use | Construction / paving materials | 30 days from 10/09/2026 |
| Prefabricated concrete elements for funeral constructions | Construction / funeral services | 40 days from 10/09/2026 |
| Verification and inspection of low-voltage electrical installations in operating rooms | Electrical installations / healthcare sector | 30 days from 10/09/2026 |
| Clear language in scientific writing | Technical and scientific communication | 30 days from 10/09/2026 |
The complete texts of each project are available at https://srp.une.org/, AENOR's official portal for consulting normative projects under processing.
Economic and operational impact
The impact of these standards is not immediate in terms of fines or penalties, but it does have real economic and operational consequences in the medium term:
- Used textiles: Companies engaged in collection, classification and recycling of clothing will have to adapt their processes to the handling and classification criteria set by the standard. This may affect investments in machinery, training and traceability systems.
- Terrazzo for exterior use: Manufacturers and distributors of terrazzo tiles will have to verify that their products comply with the technical specifications of the new standard to maintain their commercialization in public and private construction projects.
- Funeral concrete: Manufacturers of prefabricated elements for cemeteries and funeral constructions will have to adapt their products to the standard's requirements, which may involve changes in formulations, testing and certifications.
- Electrical installations in operating rooms: Electrical installers and maintenance companies for healthcare facilities will have to know and apply the new verification and inspection criteria, with direct impact on review protocols and technical documentation.
- Clear language in scientific writing: Primarily affects entities that produce technical and scientific documentation, with less direct economic impact but relevant for research organizations and companies with R&D activity.
Who does it affect?
- Companies engaged in collection, classification, reuse and recycling of used textiles
- Manufacturers and distributors of terrazzo tiles for exterior use
- Manufacturers of prefabricated concrete elements intended for funeral constructions
- Installation and maintenance companies for low-voltage electrical installations in healthcare facilities
- Managers and technical managers of hospitals, clinics and surgical centers
- Companies and organizations in the funeral sector that contract or supervise civil works
- Entities with R&D activity or production of technical and scientific documentation
- Technical advisors, quality consultants and certifiers working with any of the above sectors
Practical example
An electrical installation company that regularly works on the maintenance of operating rooms in public and private hospitals has 30 days from 10 September 2026 to review the UNE standard draft project on verification and inspection of low-voltage electrical installations in operating rooms.
If the company detects that any of the proposed technical requirements is incompatible with its current procedures—or that it generates disproportionate costs in periodic reviews—it can submit technical comments through the srp.une.org portal before the deadline expires. Once the standard is approved, that margin of influence disappears and adaptation will be mandatory without possibility of technical negotiation.
The same applies to a textile company that manages used clothing collection points: it has 40 days to review the proposed handling and classification specifications and verify whether its current operations would be compliant or would need adjustments.
What should companies do now?
- Identify if your sector is among the five affected and which UNE standard draft project corresponds to your activity (see table in the "What does this regulation establish?" section).
- Download the project text from srp.une.org and assign it to your technical or quality manager for review.
- Control the deadline: the textiles and funeral concrete projects have 40 days from 10/09/2026; the terrazzo, operating rooms and scientific language projects have 30 days. Mark the deadline dates on your calendar.
- Evaluate operational impact: compare the proposed requirements with your current processes and identify possible deviations that require investment or procedure changes.
- Submit comments if appropriate: if you detect technical requirements that do not reflect the reality of the sector or that generate disproportionate costs, use AENOR's official channel to convey your position before the deadline expires.
- Anticipate adaptation: although the standard is not yet mandatory, plan in advance the changes you will need to implement once approved, especially if they involve investment in equipment, training or certifications.
Frequently asked questions
What is the deadline for submitting comments on the UNE standard draft projects from August 2026?
It depends on the project. The draft projects on used textiles and prefabricated elements of concrete for funeral constructions have a deadline of 40 days from 10 September 2026. The draft projects on terrazzo tiles for exterior use, electrical installations in operating rooms and clear language in scientific writing have a deadline of 30 days from that same date.
Where can I consult and download the texts of the UNE standard draft projects under consultation?
The complete texts of the five projects are available on AENOR's official portal: https://srp.une.org/. It is the channel enabled for both consulting the documents and submitting technical comments and feedback.
Are UNE standards mandatory for companies?
Not automatically. UNE standards are voluntary upon approval, unless a legal or regulatory provision declares them mandatory. However, in practice they become mandatory references in public procurement, contracts with major clients and quality audits. Participating in the public consultation is the only opportunity to influence their content before they become fixed.
What sectors are affected by the UNE standard draft projects from August 2026?
The five projects affect: companies engaged in used textiles for reuse and recycling, manufacturers of terrazzo tiles for exterior use, manufacturers of prefabricated concrete elements for funeral constructions, installers and maintainers of low-voltage electrical installations in operating rooms, and entities with production of technical and scientific documentation.
How can I submit comments on a UNE standard draft project?
Through the srp.une.org portal, enabled by AENOR for public consultation of normative projects. There you can download the text, review its content and send technical comments within the established deadline (30 or 40 days depending on the project, counted from 10 September 2026).
Official source
Consult complete regulation at official source
Notice: This article is for informational purposes only and does not constitute legal advice. For specific decisions, consult a qualified professional. Source: https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-18891