Error Correction in 49 MW Solar Park Hybridized with Wind Power in Valladolid
Errors corrected in the authorization of the San Lorenzo A solar module of 49.11 MW in Valladolid, hybridized with a win...
5 Articles
Errors corrected in the authorization of the San Lorenzo A solar module of 49.11 MW in Valladolid, hybridized with a win...
Formal errors corrected in the authorization of the Solar San Lorenzo B module (39,288 MW) in Valladolid. Affects the pr...
39,288 MW solar plant authorized in Valladolid to hybridize with 39,375 MW operational wind farm. Optimizes evacuation i...
Authorized 49.11 MW solar plant in Valladolid to hybridize with San Lorenzo A wind farm (48.75 MW). Declared of public u...
Favorable EIA for the 100 MW Mudarra wind farm in Valladolid. Sectoral procedures are unblocked with mandatory condition...