43.9 MW Battery in Cuenca: Key insights for the solar photovoltaic sector
Solar Plant OPDE 25 SL obtains authorization for a 43.9 MW battery that will hybridize with the Covatillas 3 photovoltai...
12 Articles
Solar Plant OPDE 25 SL obtains authorization for a 43.9 MW battery that will hybridize with the Covatillas 3 photovoltai...
GR Aitana Renovables obtains authorization to add a 21.69 MW battery to its solar plant in Cuenca, creating a 50 MW hybr...
Green light for the PSFV Alíjar photovoltaic plant (25.99 MW, 42.44 ha) in Cádiz, hybridized with the PE Alíjar II wind ...
Heracles Solar obtains authorization for a 39.6 MW battery in Alcalá de Guadaíra that will hybridize with its 46.2 MW so...
Artemisa Energía obtains authorization for a 39.6 MW battery in Alcalá de Guadaíra (Seville) to be hybridized with its 4...
Enel Green Power withdraws the hybrid project «El Tambor-HB6» (132 MW) in Teruel due to Environmental Impact Assessment ...
Enel Green Power obtains prior administrative authorization for 107 MW hybrid in Teruel. Discover what it means for rene...
Enel Green Power Spain obtains preliminary authorization for 213 MW photovoltaic in Teruel, but 111.6 MW wind power from...
Acciona obtains authorization for a 29.5 MW solar plant in Granada, hybridized with an existing 30 MW wind farm. Shares ...
Authorized 58.12 MW hybrid wind-solar park in Bonete (Albacete). Affects landowners. Public utility declared. Effective ...
39,288 MW solar plant authorized in Valladolid to hybridize with 39,375 MW operational wind farm. Optimizes evacuation i...
El Llano Solar Plant of 53.32 MW with 5 MW battery storage approved in Zaragoza, hybridized with existing 49.95 MW wind ...