Aquarii Wind Farm Cancelled: What Renewable Developers Learn
The 70 MW Aquarii wind farm in León is cancelled due to incompatibility with the Cantabrian capercaillie recovery plan. ...
10 Articles
The 70 MW Aquarii wind farm in León is cancelled due to incompatibility with the Cantabrian capercaillie recovery plan. ...
The Directorate General for Energy Policy denies Iberdrola the construction of the Radona II solar module (32,655 MW) in...
Statkraft withdraws from the Arrebol wind farm (58.1 MW, Cádiz) following unfavorable environmental assessment. The file...
Boreas Wind obtains authorization to install a 30.3 MW BESS battery alongside the Iglesias Wind Farm (70.4 MW) in Burgos...
Iberdrola obtains prior authorization to hybridize the Sierra del Romeral wind farm (31.45 MW) with 30.9 MW photovoltaic...
Authorized 58.12 MW hybrid wind-solar park in Bonete (Albacete). Affects landowners. Public utility declared. Effective ...
The DGPEM denies the Crecente wind farm of 54 MW in Pontevedra. FRV Sotillos can appeal or reconsider the project. Direc...
Hedreira Eólica SLU cancels its 75 MW wind farm in Pontevedra and Ourense. The file is archived and Galicia loses this r...
The Directorate General for Energy Policy denies the El Cerrate wind farm (69.84 MW) in Burgos. Sevillenca Wind may appe...
The DG of Energy Policy denies the 55 MW Satola wind farm in Burgos to Arbequina Wind. The project cannot proceed withou...