New construction in flood-prone area: what you need to register it in 2026
If your new construction is in a flood-prone area or hydraulic police zone, the Registry may deny your registration. Lea...
12 Articles
If your new construction is in a flood-prone area or hydraulic police zone, the Registry may deny your registration. Lea...
The Property Registry can register an industrial lease on a gas station even if the new construction work has not been p...
If your property invades public road domain, the Registry will deny the registration of new construction. Discover what ...
The registrar cannot require a new license if the technician corrects errors in their own certification of already regis...
A neighbor with a technical report can paralyze the registration of your new construction or georeferencing. Discover wh...
The DGSJFP clarifies which documents the Registry requires to register completed new construction: georeferencing, Build...
If you want to register a horizontal division of an old building without registered surface area, the Registry may suspe...
The DGSJ revokes the denial of georeferencing registration in Almería: mere opposition from a neighboring property owner...
The Property Registry suspends the registration of an inheritance with new construction in Cangas for invading the easem...
Industrial warehouse registration denied due to construction on two plots in different municipalities without grouping t...
If you inherit a property with discrepancies between the Registry (96 m²) and the Cadastre (146 m²), article 201.2 LH is...
If you rectify surfaces in a new construction deed, you must settle the AJD for the rectification certificate or the Reg...