291 MW wind farms in Galicia: what changes for developers and affected municipalities
Five Galician wind farms (Agromaces, Ventoburgo, Sistesas, Xestiloi and Agratina) obtain favorable environmental impact ...
12 Articles
Five Galician wind farms (Agromaces, Ventoburgo, Sistesas, Xestiloi and Agratina) obtain favorable environmental impact ...
Favorable environmental approval to hybridize 21 MW photovoltaic with the 35 MW wind farm in Herrera de los Navarros (Za...
DIA approved to expand Coll del Moro and Torre Madrina in Tarragona with 22 MW additional. 4 new wind turbines, 6.68 ha ...
The EIA approves the Fontefría Norte wind cluster (Pontevedra) with 25 wind turbines, reduced from 46. Developers and th...
The EIA approves the Colladillo (22 MW) and Cabeza de Mesá (27 MW) solar parks in Ávila to be hybridized with existing w...
EIA approves 175 MW wind hybrid with solar in Burgos (Solaria). 25 wind turbines, regulatory milestone in September 2026...
The EIA of Azor Solar and Avutarda Solar parks (325 MWp in Madrid) is modified to allow installation on slopes greater t...
Favorable EIA for Escuderos I (21.6 MW) and Escuderos IV (28.8 MW) in Cuenca, hybridized with 48.29 MW photovoltaic each...
The Alhambra photovoltaic solar park (24.718 MW) in Ciudad Real obtains its favorable environmental impact declaration. ...
The El Horizonte solar plant (51,985 MW, Alicante) obtains favorable EIA on May 5, 2026. The promoter can continue autho...
The Rojalinda solar park (70.8 MWn / 81.9 MWp) in Murcia and Alicante obtains favorable EIA. Learn about the environment...
The Directorate General for Environmental Quality modifies the conditions of the EIA of the 800 MW combined cycle power ...